本答案对应课程为:点我自动跳转查看
本课程起止时间为:2020-09-06到2020-12-30
本篇答案更新状态:已完结

Chapter 1 Software Process Chapter 1 Test

1、 问题:According to Brooks, which of the following is not an essential difficulty of software development?
选项:
A:conformity
B:invisibility
C:correctness
D:changeability
答案: 【correctness

2、 问题:The software quality of supportability (adaptiveness) includes:
选项:
A:reliability
B:usability
C:maintainability
D:all of the above
答案: 【maintainability

3、 问题:The “repeatable” level of CMM (Level 2 ) means that:
选项:
A:both management and engineering processes are codified and followed
B:metrics are used to control the process
C:continuous process improvement is in place
D:none of the above
答案: 【none of the above

4、 问题:The Continuous Service Improvement Programme (CSIP) is part of:
选项:
A:CMM
B:ISO 9000
C:ITIL
D:COBIT
答案: 【ITIL

5、 问题:UML models include:
选项:
A:state models
B:state change models
C:behavior models
D:all of the above
答案: 【all of the above

6、 问题:Process-oriented integration is an integration:
选项:
A:on the level of databases or application programming interfaces (APIs) that externalizeinformation for consumption by other applications
B:in which information is externalized from multiple software systems into a commonuser interface
C:that links application interfaces (that is, services defined through an interfaceabstraction)
D:none of the above
答案: 【none of the above

7、 问题:Which of the following is not an approach to carry out system planning:
选项:
A:ERP
B:SWOT
C:ISA
D:all of the above
答案: 【ERP

8、 问题:Which of the following is a primary activity of the VCM approach:
选项:
A:human resource management
B:services
C:administration and infrastructure
D:none of the above
答案: 【services

9、 问题:Which of the following is not considered a participant (perspective) in the ISA approach:
选项:
A:subcontractor
B:owner
C:manager
D:all of the above
答案: 【manager

10、 问题:Which of the following is an OLAP technology:
选项:
A:data webhouse
B:data warehouse
C:data mart
D:all of the above
答案: 【all of the above

11、 问题:Which of the following is not an objective/task of datamining:
选项:
A:classification
B:clustering
C:packaging
D:none of the above
答案: 【packaging

12、 问题:Which of the following is not a modeling technique of the structured approach to systems development:
选项:
A:UML
B:ERD
C:DFD
D:all of the above
答案: 【UML

13、 问题:Which of the following is not considered to be an iterative and incremental development model/method:
选项:
A:the spiral model
B:functional decomposition
C:model-driven architecture
D:none of the above
答案: 【functional decomposition

14、 问题:Which of the following development models/methods directly embraces intentional programming:
选项:
A:aspect-oriented development
B:agile software development
C:genetic programming
D:none of the above
答案: 【agile software development

Chapter 2 Requirements Determination Chapter 2 Test

1、 问题:In BPMN, an atomic process is also called an:
选项:
A:activity
B:task
C:event
D:job
答案: 【task

2、 问题:In BPMN, a message flow is the following modeling element:
选项:
A:flow object
B:swimlane
C:artifact
D:connector
答案: 【connector

3、 问题:In solution envisioning, the modeling element that determines the business value of a piece of the functionality is a:
选项:
A:business use case
B:solution case
C:capability case
D:business case
答案: 【capability case

4、 问题:Which requirements elicitation method works with the notion of a probortunity statement:
选项:
A:questionnaire
B:brainstorming
C:JAD
D:none of the above
答案: 【brainstorming

5、 问题:Which requirements elicitation method works with the notion of trigger question:
选项:
A:questionnaire
B:RAD
C:JAD
D:none of the above
答案: 【none of the above

6、 问题:A relationship stating that a class “can be” another class is called:
选项:
A:generalization
B:aggregation
C:association
D:none of the above
答案: 【generalization

7、 问题:An interface requirement is a:
选项:
A:functional requirement
B:system service
C:system constraint
D:none of the above
答案: 【system constraint

Chapter 3 Requirements Specification Chapter 3 Test

1、 问题:MVC is a:
选项:
A:framework
B:meta-model
C:programming environment
D:all of the above
答案: 【all of the above

2、 问题:Which of the following is the name of the Core J2EE tier?
选项:

本门课程剩余章节答案为付费内容
本文章不含期末不含主观题!!
本文章不含期末不含主观题!!
支付后可长期查看
有疑问请添加客服QQ 2356025045反馈
如遇卡顿看不了请换个浏览器即可打开
请看清楚了再购买哦,电子资源购买后不支持退款哦

   

发表回复

您的电子邮箱地址不会被公开。 必填项已用 * 标注