2020 专门用途英语课程群(风景园林英语)(湖北工程学院) 最新满分章节测试答案

2025年3月11日 分类:免费网课答案 作者:网课帮手

本答案对应课程为:点我自动跳转查看
本课程起止时间为:2020-02-22到2020-07-13
本篇答案更新状态:已完结

【作业】Unit 1 Landscape architects and landscape architecture Assignment for Unit 1

1、 问题:风景园林设计是对户外公共区域、地标和建筑进行的设计。在设计中要对景观中现有的社会、生态和土壤条件等进行系统调查并实行一些干预措施,以实现环境、社会行为( social-behavioral )及审美的融合,并确保所有的设计计划符合所在国家及地方的建筑规范( building codes )和条例( ordinances )。该领域包括景观设计、场地规划、雨水管理、环境恢复、公园和游憩区域规划、视觉资源管理、绿色基础设施的规划和提供、私人住宅和住宅景观总体规划和设计等。风景园林行业的从业者被称为风景园林设计师。
评分规则: 【 2分—条理不清,思路紊乱,语言支离破碎或大部分句子均有错误,且多数为严重错误。5分—连贯性差。有较多的严重语言错误。8分—文字勉强连贯;语言错误相当多,其中有一些是严重错误。11分—文字连贯,但有少量语言错误。14分—文字顺通、连贯,基本上无语言错误,仅有个别小错。 

Unit 1 Landscape architects and landscape architecture Test for Unit 1

1、 问题:To follow the new trend of thought, these designers are striving to turnthe _ into an outdoor eco-lab.
选项:
A:arboretum
B:vegetation
C:fountain
D:architecture
答案: 【arboretum

2、 问题:Chilly outside, tourists found it amazing that the inn had a garden ofsemi-tropical ___ .
选项:
A:vegetation
B:arboretum
C:drainage
D:forest
答案: 【vegetation

3、 问题:Experts can combine pictures taken from airplanes and satellites with _data.
选项:
A:landfill
B:topographical
C:municipal
D:degraded
答案: 【topographical

4、 问题:Today’s complex artificial landscape requires close teamwork betweenthe ___ and the designers.
选项:
A:professionals
B:boss
C:foresters
D:workers
答案: 【foresters

5、 问题:The ____ system here, including a water-closet, is of the mostcomplete and modern kind.
选项:
A:climate
B:topographical
C:water
D:drainage
答案: 【drainage

6、 问题:The town was a seaside __ in the North-east of England,which has been over-exploited these years.
选项:
A:resort
B:place
C:project
D:site
答案: 【resort

7、 问题:Environmentalists protested against the current plan because theysay there is a high risk of pollution from the ___ site.
选项:
A:landfill
B:waste
C:polluted
D:mine
答案: 【landfill

8、 问题:As response to the public, the new __ authorities have keptthe landscape up well.
选项:
A:municipality
B:city
C:municipal
D:urban
答案: 【municipal

9、 问题:The proposal of the project that I have been involved ___ is now approved.
选项:
A:in
B:into
C:with
D:at
答案: 【with

10、 问题:Modern construction increasingly depends on ___ with environmental regulations, land-use zoning and water restrictions.
选项:
A:competition
B:composition
C:complex
D:compliance
答案: 【compliance

11、 问题:In planning a site, landscape architects will follow following steps:
选项:
A:study and analyze the site
B:prepare a preliminary design
C:propare a proposal for the client
D:prepare working drawings
答案: 【study and analyze the site;
prepare a preliminary design;
propare a proposal for the client;
prepare working drawings

12、 问题: The work of landscape architects will play an increasingly important role in shaping the world’s future by making a positive impact on:
选项:
A:economic
B:education
C:health
D:social
答案: 【economic;
health

13、 问题:Landscape architects may work in :
选项:
A:regional planning and resource management
B:site construction
C:cost studies
D:planting trees
答案: 【regional planning and resource management;
site construction;
cost studies

14、 问题:Landscape architects plan and design some sites, such as __.
选项:
A:therapeutic gardens
B:cemeteries
C:institutional centers
D:historical landscape
答案: 【therapeutic gardens;
cemeteries;
institutional centers;
historical landscape

15、 问题:When landscape architects study and analyze the site, they have to consider the following natural elements: _
选项:
A:climate
B:existing facilities
C:sunlight
D:soil
E:vegetation
F:fund available
答案: 【climate;
existing facilities;
sunlight;
soil;
vegetation

16、 问题:Landscape architects work at design of the naural environment only.
选项:
A:正确
B:错误
答案: 【错误

17、 问题:Landscape achitects plan and design both traditional places and environmental remediation.
选项:
A:正确
B:错误
答案: 【错误

18、 问题:A wide range of opportunities are open to landscape architects today because they can earn much money.
选项:
A:正确
B:错误
答案: 【错误

19、 问题:Landscape architects work with many other professionals, so they have to be good at communication.
选项:
A:正确
B:错误
答案: 【正确

20、 问题:As a student majoring in landscape architecture, CAD and GIS are necessary.
选项:
A:正确
B:错误
答案: 【正确

21、 问题:According to surveys of ASLA, landscape architecture firms have been in difficulty since the 2008 Crash.
选项:
A:正确
B:错误
答案: 【错误

22、 问题:Preparing a proposal for the client, landscape architects need to produce construction details.
选项:
A:正确
B:错误
答案: 【错误

本门课程剩余章节答案为付费内容
本文章不含期末不含主观题!!
本文章不含期末不含主观题!!
支付后可长期查看
有疑问请添加客服QQ 2356025045反馈
如遇卡顿看不了请换个浏览器即可打开
请看清楚了再购买哦,电子资源购买后不支持退款哦
请输入手机号或商家订单号
打不开请联系客服QQ 2356025045 商家订单号在哪里?点此了解

商家订单号查看步骤

打开支付宝
方法一:我的 > 账单 > 账单详情 > 更多>复制商家订单号
方法二:我的 > 账单 >搜索关键字【网课小帮手】
> 账单详情 > 更多>复制商家订单号
方法三:联系客服QQ 2356025045
微信支付
我 > 支付 > 钱包 > 账单 > 账单详情

继续阅读